Hurricane Restoration: 6,300-ft. roadway, water, sewer, drainage and dune restoration improvements due to total washout of MacArthur Boulevard from Hurricanes Francis and Jeanne in 2004
24-hour Construction Engineering and Inspection services provided for the expedited schedule to restore access and utility services to residents
Emergency replacement of existing water main for service during construction then installation of a new 12” water main and 8” force main for approximately 54 residents that lost use of their septic tank systems
Required steel sheet pile walls on both sides of the road to reinforce the 2-lane roadway access to County beaches, The House of Refuge Historical Museum, and the Sailfish Point subdivision
Included 5,400-ft of beach re-nourishment, Indian mound permitting, and The House of Refuge seawall reconstruction
Other Projects
Simara Street Bridge Repair
Sewall's Point, FL
Design, permitting and CEI for grout-filled fabric revetment (Fabriform) bank stabilization for the existing bridge abutments
Rip Rap/Bank Stabilization
Martin County, FL
Design & CEI for multiple Rip Rap and Articulated Concrete Block Mat Bank Stabilization
NRCS funding support for Emergency Watershed Protection
Hurricane Debris Removal Monitoring
Martin & St. Lucie County, FL
Continuing Services Contract Engineer for Hurricane Recovery Debris Removal Monitoring with Martin County, St. Lucie County and the City of Port St. Lucie