About Us
Services
Projects
Employment
Contact Us
Contact Us
Links
Weather



CAPTEC Engineering, Inc.
301 NW Flagler Ave.
Stuart, Florida 34994

Tel: (772) 692-4344
Fax: (772) 692-4341
captecinfo@gocaptec.com

Poinciana Gardens

The Poinciana Gardens Stormwater Retrofit Project was a phased stormwater quality retrofit that CAPTEC designed with the purpose of increasing the level of storm water service by providing an enhanced stormwater management system serving this 535 acre drainage basin, that discharges into East Fork Creek in Martin County.

The project included the design of multiple dry/wet detention areas, a Stormwater Treatment Area, and 4 control structures. The construction of the project provided additional flood protection for the residents of the basin and also provided almost 1” of water quality treatment volume for the previously developed areas of the basin.