About Us
Services
Projects
Employment
Contact Us
Contact Us
Links
Weather



CAPTEC Engineering, Inc.
301 NW Flagler Ave.
Stuart, Florida 34994

Tel: (772) 692-4344
Fax: (772) 692-4341
captecinfo@gocaptec.com

Golden Gate Retrofit

The Golden Gate Retrofit Project located in Martin County, Florida, was designed and permitted as a multi-phase retrofit project to provide water quality treatment for stormwater runoff from approximately 230 acres of previously developed area that was directly discharging, uncontrolled, into both Willoughby Creek and Crooked Creek. CAPTEC designed multiple dry/wet detention areas. Stormwater Treatment Areas (STA) and 7 control structures provided almost 1” of water quality treatment for the basin. This improved the Level of Service for the existing drainage system thereby lessening the flood levels experienced by residents from major storm events.