About Us
Services
Projects
Employment
Contact Us
Contact Us
Links
Weather



CAPTEC Engineering, Inc.
301 NW Flagler Ave.
Stuart, Florida 34994

Tel: (772) 692-4344
Fax: (772) 692-4341
captecinfo@gocaptec.com

Willoughby Boulevard Extension

• CAPTEC is currently providing Final Design and Permitting services for this 0.75 mile minor arterial within the City of Stuart for the Martin County Board of County Commissioners.

• The scope of this project involves the preparation of a Preliminary Design Report through Final design, including drainage design, utility relocations, traffic signal warrant analysis and design, roadway lighting design, and Maintenance of Traffic Design Preparation.

• 2 New Signalized Intersections designed at Central Parkway and US-1. Modifications to the existing signal at Monterey Road are also included in this project.

• Major Stormwater Improvements include the relocation of a section of the Poppleton Creek Ditch (a major drainage basin for the City of Stuart) and the creation of a Stormwater Treatment Area (STA)

• Extensive property acquisition is underway starting with negotiations with the Florida Communities Trust (FCT) Division of the Department of Community Affairs (DCA) in regards to a parcel previously purchase with assistance from an FCT grant.

• Extensive Environmental permitting has commenced with submittals to the South Florida Water Management District and Army Corps of Engineers.