About Us
Services
Projects
Employment
Contact Us
Contact Us
Links
Weather



CAPTEC Engineering, Inc.
301 NW Flagler Ave.
Stuart, Florida 34994

Tel: (772) 692-4344
Fax: (772) 692-4341
captecinfo@gocaptec.com

Becker Road Widening

• CAPTEC provided the Preliminary Design, Final Design, and all Permitting for this City of Port St. Lucie 3.6 mile major arterial project. This project also involved creating a gateway atmosphere for this section of roadway that connects recently constructed interchanges at Florida’s Turnpike and Interstate 95.

• Constructed in 4 Segments

• Widening from a 2 Lane Rural Undivided Roadway to a 4-Lane Divided Urban Arterial

• Extensive modifications to existing utility lines including water mains, sewer force mains, gas mains, and water & sewer services.

• SFWMD, ACOE, FWCC, FDEP Permitting

• Design included 5 new Signalized Intersections and Pedestrian/ Street lighting along the entire corridor. CAPTEC completed all design work in-house.

• Major Stormwater Improvements included providing for additional stormwater runoff storage and water quality treatment resulting in the addition/ expansion of 10 Stormwater Detention Ponds.


View Becker Road Widening on a map